6020
RC
Event Flow · Port Operations

Bunkering

This screen is a placeholder. It represents a feature included in the Phase scope but not yet fully implemented. The navigation structure exists so you can see the shape of the product.
What this will do

Pre-bunkering checklist (hybrid form with terminal co-signature), bunker log, BDN register, and 4-sample retention tracking. MARPOL Annex VI compliance.

Capabilities
  • Pre-bunkering checklist (BNK-01) — Category A+C hybrid
  • MARPOL bunker sample chain-of-custody tracking
  • BDN receipt upload and registration
  • Automatic ORB Part I entry on completion
  • Supplier signature co-signing workflow