Form 6020-PTW-01 · Phase 1 · Hybrid (Print-Fill-Upload)
Permit to Work — Hot Work
P1Cat A · HazardousISM §7 · ATEX/IECExPSC Mandatory
Permit Workflow State
1
Draft
2
Printed
3
At Site
4
Completed (Physical)
5
Uploaded
6
Verified
7
Approved
Current State: Draft
Form created digitally, ready to print
All items must be YES before permit can be issued. NA requires justification.
Area evacuated and cordoned off
All hot work sources of ignition removed
Gas-free certificate (GFC-01) obtained
Atmosphere test completed (LEL < 1%, O₂ 20.9%)
Fire watch appointed and briefed
CO₂ fixed system isolated
Fire extinguishers positioned at work site
Ship's fire detection system in manual mode
Adjacent compartments checked and clear
Emergency stop procedures communicated
LEL < 1% · O₂ 20.9% ± 0.5% · H₂S < 1 ppm required before and during work.
| Time | Location | LEL % | O₂ % | H₂S ppm | Recorded By |
|---|---|---|---|---|---|
| 07:30 | Manifold Deck — Forward | 0.0 | 20.9 | 0.0 | H. Larsen (CE) |
| 08:00 | Manifold Deck — Forward | 0.0 | 20.9 | 0.0 | H. Larsen (CE) |
Fire watch must remain on site until work area has cooled to ambient temperature (minimum 30 min after work stops).
Chief Officer
Priya Raman — Signed
Chief Engineer
Henrik Larsen — Signed
Master
Awaiting signature